Tender Details

Particulars Details
Title
Rf Watt Meter
Description
Organisation Department of Military Affairs | Ministry of Defence
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee
EMD
Tender Value
Place
Link

AAAAAAAAAA

Login to view
Start Date May 31, 2025 21:30
End Date

21/06/2025 ( 9 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Tender Result
Tender Status: Active
Additional Information: Average Turn Over of Last 3 Years: Lakhs Experience with Gov. Required: Years
Buyer Details
Name: ***********
Address: *********** AMRITSAR
Ministry: Ministry Of Defence
Department: Department Of Military Affairs
Organisation: Indian Air Force
Office Address: ***********
Similar Tenders
Contract for development of rf high power circulator switch assemblies

Contract for development of rf high power circulator switch assemblies

Read more
Construction of buttress wall below the 1065 mb level buttress wall of dep- 14 (20 meter in length) at dep 14 biom kirandul complex

Construction of buttress wall below the 1065 mb level buttress wall of dep- 14 (20 meter in length) at dep 14 biom kirandul complex

Read more
Supply of 3px4w, 3x240v, 40-200a, direct connected (prodigy meter)

Supply of 3px4w, 3x240v, 40-200a, direct connected (prodigy meter)

Read more
Supply of 11 kv ht tvm cat-a meter, 11 kv ht tvm cat-c meter and 33 kv ht tvm cat-c meter

Supply of 11 kv ht tvm cat-a meter, 11 kv ht tvm cat-c meter and 33 kv ht tvm cat-c meter

Read more
Procurement of ash slurry density meter installed in silo area at ahp for imd-4, stps, sarni.

Procurement of ash slurry density meter installed in silo area at ahp for imd-4, stps, sarni.

Read more
Construction of buttress wall towards eastern side drain slope of 994 mb bench 50 meter and 30 meter length dep 11c biom kirandul complex

Construction of buttress wall towards eastern side drain slope of 994 mb bench 50 meter and 30 meter length dep 11c biom kirandul complex

Read more
Construction of buttress wall at the toe of existing waste dump, active dump (100 meter in length) 11b mining, biom kirandul complex

Construction of buttress wall at the toe of existing waste dump, active dump (100 meter in length) 11b mining, biom kirandul complex

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise