Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Dindigul Pollachi Section : Through Formation Treatment ( Tftr) At Km 101.200 104.800 For A Length Of 3.60 Kms In Between Udumalaippettai Gomangalam Stations Under Senior Section Engineer/Permanent Way/Palani Section.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 79538479 |
Reference Number |
MDU-W-01-2025-01 |
Tender Fee | 0 |
EMD | 7.75 Lakh |
Tender Value | |
Place | Chennai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79538479/viewNitPdf_4833410.pdf |
Start Date | January 17, 2025 17:43 |
End Date |
10/02/2025 ( Expired 139 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang
Construction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang
Read moreShort term maintenance contract works of nh-215 (trans arunachal highway) through stmc from ch. 14.600 km (disang bridge) to ch. 63.400 km (barbaruah) ( length 48.800) under pwd dibrugarh nh division in the state of assam for the year 2025-26
Short term maintenance contract works of nh-215 (trans arunachal highway) through stmc from ch. 14.600 km (disang bridge) to ch. 63.400 km (barbaruah) ( length 48.800) under pwd dibrugarh nh division in the state of assam for the year 2025-26
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreConsultancy services for authority engineer for supervision of four laning of hospet bellary section ap boarder from km 280.080 to km 375.450 design length 95.370 nh67 in the state of karnataka under nhdp phaseiv b on epc mode
Consultancy services for authority engineer for supervision of four laning of hospet bellary section ap boarder from km 280.080 to km 375.450 design length 95.370 nh67 in the state of karnataka under nhdp phaseiv b on epc mode
Read moreConstruction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreEhabilitation and upgradation for kopargaon to savli vihir section from km. 354.000 to km.362.663 total length 8.663 of nh 752 g to 4l.ps in the state of maharashtra. repairs of bad patches and dis at the risk and cost of the contractor as per
Ehabilitation and upgradation for kopargaon to savli vihir section from km. 354.000 to km.362.663 total length 8.663 of nh 752 g to 4l.ps in the state of maharashtra. repairs of bad patches and dis at the risk and cost of the contractor as per
Read moreIe services for construction of four laning of nanasa to pidgaon section of nh47 old nh59a indore harda pkgiii length 47.445km design ch. 95.000 km to 142.445 km under bharatmala pariyojna phase-i economic corridor in the state of mp on ham basis
Ie services for construction of four laning of nanasa to pidgaon section of nh47 old nh59a indore harda pkgiii length 47.445km design ch. 95.000 km to 142.445 km under bharatmala pariyojna phase-i economic corridor in the state of mp on ham basis
Read moreEngagement of user fee agency through eq for pardimakta fee plaza at loha-waranga section of nh-361 from km. 187.800 to km 244.369 (design length 56.569 km) under bharatmala pariyojna in maharashtra
Engagement of user fee agency through eq for pardimakta fee plaza at loha-waranga section of nh-361 from km. 187.800 to km 244.369 (design length 56.569 km) under bharatmala pariyojna in maharashtra
Read moreEngagement of user fee agency on the basis of cb through etender at rajora khurd fp at km 25.600 for uncha nagla khanua roopwas dholpur section of nh123 to two lane with paved shoulder in rajasthan
Engagement of user fee agency on the basis of cb through etender at rajora khurd fp at km 25.600 for uncha nagla khanua roopwas dholpur section of nh123 to two lane with paved shoulder in rajasthan
Read moreConst. of inspection chamber, raising of manhole and laying of sewer line for commissioning of s/s laid by owssb through ecci at nuasahi canal road near siba sakti club to main road nh side in connection with s/s, under watco section ggp colony, bbsr
Const. of inspection chamber, raising of manhole and laying of sewer line for commissioning of s/s laid by owssb through ecci at nuasahi canal road near siba sakti club to main road nh side in connection with s/s, under watco section ggp colony, bbsr
Read moreof your Industry type